- Joints of the brick siding were refilled in 2012 - The fence and sidewalk were redone in 2012 - The bathroom was renovated in 2011 - The flooring of the main floor was renovated in 2011 - The wall of the first floor was repainted in 2011 - The ventilation and ceiling lights of the first floor was renovated in 2025 - The flooring and the ceiling of the basement was changed in 2025 - The toilet and the sink of the basement were changed in 2025 - The furnace and central AC were changed in 2019 - The deck was redone in 2025.